Industrial process plant illuminated at night
ORAKEM / Insights

AI data centres in the Gulf: the cooling water challenge

High-density computing needs reliable cooling in one of the hottest, driest climates on earth. Water treatment sits at the centre of that trade-off.

                                                                                    Data centres · 6 min read

                                                                                    The UAE and Saudi Arabia are building data centre capacity at record speed to support national AI strategies. Every megawatt of computing becomes a megawatt of heat that has to be rejected, often at outdoor temperatures close to 50 °C. Operators choose between air-based, adiabatic, evaporative and liquid cooling, and each choice trades water against energy.

                                                                                    Why water still matters

                                                                                    Even sites that avoid open evaporative towers often rely on chilled-water loops, adiabatic pads or hybrid coolers. Recent international analysis found that a large share of AI data centre capacity sits in areas of high water stress, and Gulf operators are already testing TSE and other alternative sources for cooling. The direction is clear: less water per megawatt, and lower-quality water sources.

                                                                                    What can go wrong

                                                                                    • Corrosion and sludge in chilled-water loops that block strainers and cold plates.
                                                                                    • Scale and biofilm on condensers when towers run at high cycles in summer.
                                                                                    • Legionella risk where adiabatic or evaporative systems sit near air intakes.
                                                                                    • Variable make-up quality when switching to TSE or recycled water.

                                                                                    What good looks like

                                                                                    Data centres measure everything else, and water should be no different. Online monitoring of conductivity, corrosion and microbiology, automated blowdown, clean and passivated loops from commissioning, and a reported water use per unit of IT load. In a business where downtime is the biggest cost, treatment is cheap insurance.

                                                                                    Get a free review of your system

                                                                                    Send us your water analysis or operating data. An engineer replies within one working day.

                                                                                    Book a site survey

                                                                                                                          Book a site survey
                                                                                                                          WhatsApp us