                                                                                      Green hydrogen projects across the Gulf are moving from announcements to engineering. Electrolysis splits water into hydrogen and oxygen, so water is the feedstock, not a utility. The usual rule of thumb is about 9 to 10 litres of ultrapure water per kilogram of hydrogen, or roughly 200 litres per hour for each megawatt of electrolyser capacity.

                                                                                      More raw water than you think

                                                                                      Producing ultrapure water takes more raw water than the electrolyser consumes. Published estimates suggest around 1.5 times as much fresh water, or about three times as much seawater, once desalination losses are counted. If the plant uses evaporative cooling, total water demand rises much further.

                                                                                      The treatment chain

                                                                                      1. Intake and pretreatment: screening, filtration and, for seawater, careful control of fouling.
                                                                                      2. Desalination by RO, with antiscalant and cleaning programmes set for the feed.
                                                                                      3. Polishing by a second RO pass, electrodeionisation or mixed-bed ion exchange.
                                                                                      4. Continuous monitoring of conductivity and silica before the electrolyser.

                                                                                      Why it deserves attention early

                                                                                      Water treatment is a small share of a hydrogen project’s capital cost but a single point of failure: off-spec water can trip or damage electrolyser stacks. Designing the water system, its chemical programmes and its brine management early protects the most expensive equipment on site.